Analysis on Rapid Excavation Technology
Applied in Inclined Shaft of Dabieshan Tunnel

SHANG Xian-Gao, GAO Wei, LUO Chi-Jun   

  1. 1. China Railway Tunnel Group Co., Ltd.2. The1st Construction Division of China Railway Tunnel Group Co., Ltd.
  • Received:2006-01-13 Revised:2006-04-10 Online:2006-06-20 Published:2009-12-09

Abstract:

The article gives a detailed analysis on the initial poor excavation construction of the inclined shaft of Dabieshan tunnel on Hefei~Wuhan passengerdedicated railway. On basis of the existing problems, the article recommends some countermeasures, which result in higher advance rate, reduced cycle time, minimum overbreak/shortbreak, decreased construction period and reduced cost.

Key words: tunnel, inclined shaft  rapid excavation , technology  analysis