Tunnel Construction ›› 2006, Vol. 26 ›› Issue (3): 73-75.DOI: B
• wenzhang • Previous Articles Next Articles
LIN Sanguo
Received:
Revised:
Online:
Published:
Abstract:
During the top heading construction of Matijing tunnel on GanzhouLongyan railway, huge deformation occurs to the 30mlong exit portal section, which is followed by full collapse. Several treatment options are attempted, but unfortunately no success is achieved. After thorough geological investigations, it is determined that there exist landslide, on basis of which comprehensive treatment plan is prepared. The article presents the landslide treatment method, demonstrating the great importance of thorough geological investigations in tunnel engineering works.
Key words: tunnel  , landslide  , comprehensive treatment
CLC Number:
 
U216.41+9.1
LIN Sanguo. Treatment of Landslide at Tunnel Portals[J]. Tunnel Construction, 2006, 26(3): 73-75.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2006/V26/I3/73