ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2006, Vol. 26 ›› Issue (3): 79-81.DOI: B
• wenzhang • Previous Articles Next Articles
SUN Yong-Gang
Received:
Online:
Published:
Abstract:
In order to increase the running speed of the trains and to strengthen the competibility of the railway transportation system, the level railway crossing junctions are required to be converted into grade junctions. Therefore, jacking of frameshaped culverts is needed so as to avoid the interruptions of the railway system. This paper introduces the technology for the reinforcement of the existing railways, as well as the construction methods, technical measures, deviation prevention methods and deviation correction methods taken during the jacking of the largespan obliquecrossing frameshaped culvert.
Key words: frameshaped culvert, jacking technology
CLC Number:
U445
SUN Yong-Gang. Jacking Technology of Largespan Obliquecrossing Frameshaped Culvert[J]. Tunnel Construction, 2006, 26(3): 79-81.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2006/V26/I3/79