ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2006, Vol. 26 ›› Issue (3): 95-97,100.DOI: C
• wenzhang • Previous Articles Next Articles
SUN Zhi, LIN Fu-Xiang
Received:
Online:
Published:
Abstract:
On basis of the features of the bill of quantities and the features of the market, as well as the the author's experience, this paper discusses on how to grasp the key points of the bill of quantities when editing the bidding document. The author holds the point that when editing the bidding document, special attention should be paid to such issues as demand analysis, contract awarding manner, types of contract price, protective contract clauses, bid evaluation method and division and description of different items of bill of quantities.
Key words: bill of quantities bidding document  , cost calculation bid evaluation
CLC Number:
F284
SUN Zhi, LIN Fu-Xiang. Discussion on Issues to which Special Attention should be Paid when Editing Bill of Quantities of Bidding Document[J]. Tunnel Construction, 2006, 26(3): 95-97,100.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/C
http://www.suidaojs.com/EN/Y2006/V26/I3/95