Impact of Overbreak/shortbreak on Tunnel Construction
Cost and Their Control Approaches

WANG Cheng-Shan   

  1. China Railway Tunnel Jointstock Co., Ltd.
  • Received:2006-01-25 Online:2006-08-20 Published:2010-04-21

Abstract:

 The article expatiates on the causes for the overbreak/shortbreak in the drill+blast tunneling and analyzes on the impact of the overbreak/shortbreak on the increase of the tunnel construction cost. Finally, the article recommends three main approaches for the control of the overbreak/shortbreak during tunneling, i.e., ① strengthening the site construction management, which is the fundamental approach to reduce the overbreak/shortbreak; ② fulfilling NATM technology, which is the effective technical approach to reduce the overbreak/shortbreak; ③ replacing the traditional viewpoint of “overbreak rather than shortbreak” by the viewpoint of “less overbreak and less shortbreak”.

Key words: tunnel  , overbreak/shortbreak  , construction cost  , control approach  