ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2006, Vol. 26 ›› Issue (4): 13-15.DOI: B
• wenzhang • Previous Articles Next Articles
WANG Cheng-Shan
Received:
Online:
Published:
Abstract:
The article expatiates on the causes for the overbreak/shortbreak in the drill+blast tunneling and analyzes on the impact of the overbreak/shortbreak on the increase of the tunnel construction cost. Finally, the article recommends three main approaches for the control of the overbreak/shortbreak during tunneling, i.e., ① strengthening the site construction management, which is the fundamental approach to reduce the overbreak/shortbreak; ② fulfilling NATM technology, which is the effective technical approach to reduce the overbreak/shortbreak; ③ replacing the traditional viewpoint of “overbreak rather than shortbreak” by the viewpoint of “less overbreak and less shortbreak”.
Key words: tunnel  , overbreak/shortbreak  , construction cost  , control approach  
CLC Number:
 
U455
WANG Cheng-Shan. Impact of Overbreak/shortbreak on Tunnel Construction Cost and Their Control Approaches[J]. Tunnel Construction, 2006, 26(4): 13-15.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2006/V26/I4/13