ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2006, Vol. 26 ›› Issue (4): 16-19,48.DOI: B

• wenzhang • Previous Articles     Next Articles

Analysis on Insitu Measurement of Biased Pressure
Section of Doublearched Fuxi Tunnel

TUN Jiang, LIU Bao-Guo   

  1. Civil Engineering &|Architecture School of Beijing Jiaotong University
  • Received:2005-11-21 Revised:2006-01-11 Online:2006-08-20 Published:2010-04-21

Abstract:

The article presents in detail the monitoring results of the biasedpressure entrance section of the doublearched Fuxi tunnel on Tong~Huang highway and presents the analysis on the monitoring results. Furthermore, on basis of the construction practice of the tunnel, thearticle analyses on the features of the perimeter displacement of the surrounding rock mass, the crown settlement, the loading conditions of the reinforcement structure and theground surface settlement of the tunnel and recommends some engineering countermeasures, which provides timely and effective guidance for the reinforcement and consolidation of the tunnel, thus guaranteeing the tunnel construction safety.

Key words: doublearchedtunnelwith biased pressure monitoringand measurement  , deformation engineering countermeasure

CLC Number: