ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2006, Vol. 26 ›› Issue (4): 20-24.DOI: B

• wenzhang • Previous Articles     Next Articles

Comparison of Different Operation Ventilation
Options for Longtan Superlong Highway Tunnel

 CHEN Guang-Meng, CHEN Zhang, HU Yi-Hua   

  1. Communications Planning &|Design Institute of Hubei Province
  • Received:2005-11-28 Revised:2006-03-06 Online:2006-08-20 Published:2010-04-21

Abstract:

Longtan tunnel under construction is a superlong highway tunnel of about 2×8.7km length on Yichang~Enshi section of the national highway from Shanghai to Chengdu. The operation ventilation system of Longtan tunnel requires careful researches. On basis of the actual conditions of the tunnel, a technicallyreliable and costeffective operation ventilation option is determined for the tunnel by means of technic and economic comparisons in terms of ventilation efficiency, disaster prevention, emergency rescue and construction convenience.

Key words: superlong highway tunnel  , operation  , ventilation option

CLC Number: