The paper gives a detailed analysis on the causes for the cracks of the concrete linings of a railway tunnel located in Northwest of China and presents the critical aspects and results of the repairing of the cracks by means of automatic lowpressure grouting of modified epoxy resin, which provides a new construction method for the repairing of the cracks of the tunnel linings in the future.
Key words: crack of concrete lining  , cause analysis  , automatic lowpressure grouting technology  , crack repairing