Cause Analysis on and Repairing of Lining Cracks of a Railway Tunnel

WANG Meng-Yang   

  1. The 2nd Engineering Co., Ltd. of China Railway Tunnel Group
  • Received:2006-02-20 Revised:2006-03-28 Online:2006-08-20 Published:2010-04-21

Abstract:

The paper gives a detailed analysis on the causes for the cracks of the concrete linings of a railway tunnel located in Northwest of China and presents the critical aspects and results of the repairing of the cracks by means of automatic lowpressure grouting of modified epoxy resin, which provides a new construction method for the repairing of the cracks of the tunnel linings in the future.

Key words: crack of concrete lining  , cause analysis  , automatic lowpressure grouting technology  , crack repairing

CLC Number: