Abstract:
Fullface construction is conducted for Dabieshan tunnel, which is a large crosssection tunnel on WuhanHefei passengerdedicated railway. TSP advance geology forecasting is conducted during the construction of the tunnel penetrating through the fractured surrounding rock mass, so as to determine the distance and strike of the fractured zone. On basis of the geological conditions exposed by the tunnel excavation, numerical simulation and theoretical analysis are performed by means of universal distinct element code (UDEC) for the tunnel excavation and reinforcement in the fractured zone. The measured results indicate that the crown settlement pattern obtained through calculations by means of UDEC coincides well with that obtained through insitu measurement and that the deformation values are lower than the designed allowable values, whichdemonstrates that thesurrounding rock mass and reinforcement structure of the tunnel are stable.
Key words: DEM, large cross sectiontunnel, fractured zone, construction scheme, passenger dedicated railway
CLC Number:
U455.4
ZHOU E-Yu. Study on Fullface Construction Scheme of Fractured Section of Dabieshan Tunnel[J]. Tunnel Construction, 2006, 26(4): 54-57.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/A
http://www.suidaojs.com/EN/Y2006/V26/I4/54