[1] |
ZHAO Yong, YU Zufa, CAI Jue, LYU Gang, LIU Jianyou, YUE Ling.
Design Concept and Implementation Path for Badaling
Great Wall Station of BeijingZhangjiakou Highspeed Railway
[J]. Tunnel Construction, 2020, 40(7): 929-940.
|
[2] |
LI Xiaojun, TIAN Yinxue, CHEN Shuwang, WANG Anmin.
Application Status and Analysis of Building
Information Model (BIM) Technology
in Tunnel Engineering
[J]. Tunnel Construction, 2020, 40(7): 953-0963.
|
[3] |
FENG Haibao, LIU Junwei, SU Changxi.
Analysis of Channel Dimensions for Immersed Tube
Element Towed by Selfpropelled Catamaran: a Case Study on
Immersed Tunnel of ShenzhenZhongshan
Link
[J]. Tunnel Construction, 2020, 40(6): 840-844.
|
[4] |
LIU Ze, WANG Yong, LI Xiaofeng, WU Zhihao.
Key Technologies for Type Selection and Application of
Doublemode TBM in Complex Geology of Sea Area
[J]. Tunnel Construction, 2020, 40(6): 868-872.
|
[5] |
ZHANG Binrong, GUAN Huisheng, TAN Xiaofeng, LIAO Jiang, YANG Xiao, LI Xia.
Dynamic Model and Vibration Analysis of TBM Edge Disccutter
Based on MATLAB/Simulink
[J]. Tunnel Construction, 2020, 40(6): 833-839.
|
[6] |
朱雁飞, 郭 彦, 潘伟强, 赵笑鹏.
自由断面管幕法在饱和软土地区桂桥路站地铁工程的应用
[J]. Tunnel Construction, 2020, 40(4): 552-561.
|
[7] |
GAO Jun, MENG Xiaowei, MA Longxiang, ZHANG Chao, LIU Jinchao.
Protection Schemes for Pipe Jacking Construction of Underpass Adjacent to Bridge in Soft Soils
[J]. Tunnel Construction, 2019, 39(S2): 234-241.
|
[8] |
LUO Yizhou, GUO Xiaonong.
Experimental Study of Bending Performance of Aluminum Alloy Cavity Composite Member
[J]. Tunnel Construction, 2019, 39(S1): 227-234.
|
[9] |
CHEN Jianguo.
Comparison and Selection of Advance Reinforcement Schemes for Aeolian Sand Section of Eton Brack No.1 Tunnel on Geku Railway
[J]. Tunnel Construction, 2019, 39(S1): 377-384.
|
[10] |
YAO Yuxiang, LI Sheng, MA Li, WANG Huan, WANG Changdan.
Numerical Simulation of Reinforcement Load Reduction for Highfilled Opencut Tunnel Based on Particle Flow
[J]. Tunnel Construction, 2019, 39(9): 1461-1470.
|
[11] |
LI Guimin.
Key Technologies for Design and Construction of Huangshanshao Tunnel on LijiangShangrila Railway Crossing underneath Rockpile Section
[J]. Tunnel Construction, 2019, 39(9): 1494-1499.
|
[12] |
ZHAO Qianjin, LI Jingwei.
Key Construction Technology for Xinping Tunnel on Yuxi-Mohan Railway Crossing Dense Fault and Fracture Zone
[J]. Tunnel Construction, 2019, 39(12): 2058-.
|
[13] |
XIAO Guangzhi.
Problems of Railway Tunnel Construction under Some Special Geological Conditions in China and Their Countermeasures
[J]. Tunnel Construction, 2019, 39(11): 1748-.
|
[14] |
ZHANG Jiangang, MENG Qingming, LI Wei, HE Chuan.
Mechanical Analysis of Segment Joints with Different Arrangement of Waterproof Sealing Gaskets
[J]. Tunnel Construction, 2019, 39(11): 1790-.
|
[15] |
GUAN Xiaojun, LI Chang, QIU Wenge, SHEN Zhijun, GONG Lun, WANG Gang.
Influence of Surrounding Rock Deterioration on Supporting Force of Deep Old Loess Tunnel
[J]. Tunnel Construction, 2019, 39(11): 1806-.
|