ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2006, Vol. 26 ›› Issue (4): 68-71.DOI: B
• wenzhang • Previous Articles Next Articles
DU Jian-Hua, CHEN Gong-Yun
Received:
Online:
Published:
Abstract:
Due to the complex geological conditions of Guangzhou Metro project, for example the shield machines need to bore through karst caves and highstrength granite and cross underneath the Pearl River, a lot of shield machine construction experience has been accumulated during the construction, while numerous difficult problems have been encountered. The article makes an analysis on the geological conditions of Guangzhou Metro project and makes a study on and summary of the EPB shield machine construction technology under complex geological conditions.
Key words: Metro  , shield machine  , boring technology
CLC Number:
U455.44
DU Jian-Hua, CHEN Gong-Yun. Study on EPB Shield Machine Construction Technology under Complex Geological Conditions Achieved in Guangzhou Metro[J]. Tunnel Construction, 2006, 26(4): 68-71.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2006/V26/I4/68