Problems in Construction of Bored CastinSitu Concrete
Piles in Karst Region and their Countermeasures

LI Lin-Feng   

  1. Beijing Vibroflotation Engineering Co., Ltd.
  • Received:2005-11-15 Revised:2006-02-08 Online:2006-08-20 Published:2010-04-21

Abstract:

Taking the construction of the bored castinsitu concrete piles in a large electricity power plant in Jiangxi province as example, the article presents the geological conditions and the karst development features of the site. On basis of the construction process of the bored castinsitu concrete piles in such geological conditions and problems encountered during construction, such as hole collapse, hole inclination, hole connection, grout leakage, drilling tool blocking, drilling tool dropping and pile body concrete sinking, the article analyses on the causes for the problems and recommends some detailed prevention and treatment countermeasrues.

Key words: bored castinsitu concrete pile  , karst region  , analysis countermeasure