[1] |
ZHAO Yong, YU Zufa, CAI Jue, LYU Gang, LIU Jianyou, YUE Ling.
Design Concept and Implementation Path for Badaling
Great Wall Station of BeijingZhangjiakou Highspeed Railway
[J]. Tunnel Construction, 2020, 40(7): 929-940.
|
[2] |
LI Xiaojun, TIAN Yinxue, CHEN Shuwang, WANG Anmin.
Application Status and Analysis of Building
Information Model (BIM) Technology
in Tunnel Engineering
[J]. Tunnel Construction, 2020, 40(7): 953-0963.
|
[3] |
FENG Haibao, LIU Junwei, SU Changxi.
Analysis of Channel Dimensions for Immersed Tube
Element Towed by Selfpropelled Catamaran: a Case Study on
Immersed Tunnel of ShenzhenZhongshan
Link
[J]. Tunnel Construction, 2020, 40(6): 840-844.
|
[4] |
GONG Tingmin, JIA Lianhui, CHEN Wentao, ZHENG Yongguang.
Key Technologies of Hard Rock Slurry Balance Pipe
Jacking Machine for Composite Ground
[J]. Tunnel Construction, 2020, 40(6): 880-889.
|
[5] |
LIU Ze, WANG Yong, LI Xiaofeng, WU Zhihao.
Key Technologies for Type Selection and Application of
Doublemode TBM in Complex Geology of Sea Area
[J]. Tunnel Construction, 2020, 40(6): 868-872.
|
[6] |
ZHANG Binrong, GUAN Huisheng, TAN Xiaofeng, LIAO Jiang, YANG Xiao, LI Xia.
Dynamic Model and Vibration Analysis of TBM Edge Disccutter
Based on MATLAB/Simulink
[J]. Tunnel Construction, 2020, 40(6): 833-839.
|
[7] |
CHEN Xianzhi, CHENG Yong, YANG Xiaolong, LIU Fei, HU Qinxin, LIU Pengfei.
Experimental Study on Ground Conditioning Technology for EPB Shield Boring in Water-rich Gravel Stratum
[J]. Tunnel Construction, 2020, 40(5): 636-643.
|
[8] |
WANG Kun, YE Lei, CHENG Yonglong, GAO Wenliang, ZHANG Shuqi, ZHENG Liangkui .
Sealing Device for Launching and Receiving of Tunneling Machine for Connection Gallery with Mechanical Excavation Method
[J]. Tunnel Construction, 2020, 40(1): 134-142.
|
[9] |
WANG Qianshen, FENG Kun, LI Debin, HE Chuan, PENG Zuzhao, GUO Huasheng.
Ground Pore Water Pressure Disturbed by Slurry Balanced Shield Tunneling
[J]. Tunnel Construction, 2019, 39(S1): 266-273.
|
[10] |
JIANG Xiaotian.
Design of Earth Pressure Balanced Boxculvert Tunneling Machine
[J]. Tunnel Construction, 2019, 39(6): 1045-1051.
|
[11] |
YAO Xianli.
Construction Technology of Metro Shield Continuously Crossing underneath Riverway and Railway in Silt Layer in Israel
[J]. Tunnel Construction, 2019, 39(5): 858-867.
|
[12] |
WU Hongbo, ZHOU Chuanbo, JIANG Nan, GAO Tan.
Ground Deformation Characteristics of Doubletrack Metro Tunnel Bored by Slurry Balance Shield and EPB Shield
[J]. Tunnel Construction, 2019, 39(2): 219-226.
|
[13] |
XIAO Guangzhi.
Problems of Railway Tunnel Construction under Some Special Geological Conditions in China and Their Countermeasures
[J]. Tunnel Construction, 2019, 39(11): 1748-.
|
[14] |
ZHANG Jiangang, MENG Qingming, LI Wei, HE Chuan.
Mechanical Analysis of Segment Joints with Different Arrangement of Waterproof Sealing Gaskets
[J]. Tunnel Construction, 2019, 39(11): 1790-.
|
[15] |
GUAN Xiaojun, LI Chang, QIU Wenge, SHEN Zhijun, GONG Lun, WANG Gang.
Influence of Surrounding Rock Deterioration on Supporting Force of Deep Old Loess Tunnel
[J]. Tunnel Construction, 2019, 39(11): 1806-.
|