ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2006, Vol. 26 ›› Issue (5): 24-27.DOI: A

• wenzhang • Previous Articles     Next Articles

tudy on Control Measures for Differential Settlement between
Newlybuilt Structures and Existing Structures during
Renovation of Existing Line of Tianjin Metro

JU Yu   

  1. Tianjin Infrastructure Investment Group
  • Received:2006-09-13 Online:2006-10-20 Published:2010-04-16

Abstract:

The control of the differential settlement subject to occur during the renovation of the existing stations of line 1 of Tianjin Metro must be guranteed. Due to the fact that these existing Metro stations are located right below the main streets with busy traffics, there exist great difficulties in the renovation of the Metro stations. From the viewpoint of construction environment protection and safety, the paper studies on the settlement of the controling structures of the Metro stations that occurs both during excavation and after renovation and backfilling and studies on the measures to minimize the differential settlement between the newlybulit structures and the existing structures. Finally, the paper recommends countermeasures for the control of the differential settlement.

Key words: existing Metro line renovation  , differential settlement  , newlybuilt structure and existing structure

CLC Number: