[1] |
ZHAO Yong, YU Zufa, CAI Jue, LYU Gang, LIU Jianyou, YUE Ling.
Design Concept and Implementation Path for Badaling
Great Wall Station of BeijingZhangjiakou Highspeed Railway
[J]. Tunnel Construction, 2020, 40(7): 929-940.
|
[2] |
LIU Yi, ZHU Liangcheng.
Current Status and Future Perspectives of Urban Underground Space Development in Shanghai
[J]. Tunnel Construction, 2020, 40(7): 941-952.
|
[3] |
LI Xiaojun, TIAN Yinxue, CHEN Shuwang, WANG Anmin.
Application Status and Analysis of Building
Information Model (BIM) Technology
in Tunnel Engineering
[J]. Tunnel Construction, 2020, 40(7): 953-0963.
|
[4] |
LYU Qingzhou, TANG Ximing.
Improvement and Application of Pipe Jacking Machine in
Complex Stratum with Steel Bar and Other Flexible Sundries
[J]. Tunnel Construction, 2020, 40(7): 1066-1071.
|
[5] |
CHEN Ziquan, KOU Hao, YANG Wenbo, HE Chuan, LI Yonglin.
Cases Analysis of Mechanical Behavior Characteristics
of Tunnel Supporting Structure in Mountainous Areas in
Southwest China
[J]. Tunnel Construction, 2020, 40(6): 800-812.
|
[6] |
FENG Haibao, LIU Junwei, SU Changxi.
Analysis of Channel Dimensions for Immersed Tube
Element Towed by Selfpropelled Catamaran: a Case Study on
Immersed Tunnel of ShenzhenZhongshan
Link
[J]. Tunnel Construction, 2020, 40(6): 840-844.
|
[7] |
LIU Ze, WANG Yong, LI Xiaofeng, WU Zhihao.
Key Technologies for Type Selection and Application of
Doublemode TBM in Complex Geology of Sea Area
[J]. Tunnel Construction, 2020, 40(6): 868-872.
|
[8] |
ZHANG Binrong, GUAN Huisheng, TAN Xiaofeng, LIAO Jiang, YANG Xiao, LI Xia.
Dynamic Model and Vibration Analysis of TBM Edge Disccutter
Based on MATLAB/Simulink
[J]. Tunnel Construction, 2020, 40(6): 833-839.
|
[9] |
油新华, 曲连峰, 罗朝洪.
我国城市综合管廊的建设经验、问题与建议
[J]. Tunnel Construction, 2020, 40(5): 621-628.
|
[10] |
ZHANG Yu, YANG Junsheng, ZHU Zhiheng, TANG Zhiyang, FU Jinyang.
Study and Application of Global Deformation Monitoring Technology of Tunnel Primary Support Based on Image Point Cloud Space Distance Measurement Algorithm
[J]. Tunnel Construction, 2020, 40(5): 686-694.
|
[11] |
WANG Jingchun, XUE Jialong, HUANG Wenhua, LIU Chao, CHEN Sibo.
Modification and Application of Nemerow Index in Influence Assessment of
Tunnel Construction on Scenic Spot Environment
[J]. Tunnel Construction, 2020, 40(4): 475-480.
|
[12] |
LI Tiesheng.
Key Technologies for Design and Construction of Metro Station by Pipe-roof PBA Method
[J]. Tunnel Construction, 2020, 40(4): 531-537.
|
[13] |
DU Chuangdong, ZHANG Jie, WU Yuebin.
Application of Construction Technology of "Tunneling First and Then Station"
in Tel Aviv Red Line Project in Israel
[J]. Tunnel Construction, 2020, 40(4): 562-568.
|
[14] |
陈 越, 陈伟乐, 宋神友, 刘 健, 金文良.
深中通道沉管隧道主要建造技术
[J]. Tunnel Construction, 2020, 40(4): 603-610.
|
[15] |
WANG Mingyou, HOU Shaokang, LIU Yaoru, JIN Feng.
Influence of Backfill Grouting Compactness of TBM Pea-gravel on Supporting Effect
[J]. Tunnel Construction, 2020, 40(3): 326-336.
|