ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2006, Vol. 26 ›› Issue (5): 63-65,100.DOI: B

• wenzhang • Previous Articles     Next Articles

 PileBeamArch (PBA) |Construction Technology for Mined Metro Stations

SHU Ze-Min   

  1. China Railway Erju Co., Ltd.
  • Received:2006-08-28 Online:2006-10-20 Published:2010-04-16

Abstract:

The paper introduces the construction technology of PileBeamArch (PBA) mehtod applied in the mined North Gongti Road Station of line 10 of Beijing Metro, including the principle and features of PBA method, the construction procedure and the analysis and summary of the key technology. PBA method, which has a good application prospect in the current construction of the Metro works, can be referred to for other similar works in the future.

Key words: Beijing Metro mined Metro station  , PileBeamArch (PBA) method  , construction technology

CLC Number: