ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2006, Vol. 26 ›› Issue (6): 37-40.DOI: B

• wenzhang • Previous Articles     Next Articles

Emergency Rescue and Disaster Prevention Plan and Collapse Prevention
Countermeasures for Wushaoling Extralong Tunnel

SONG Jian-Beng, LI Guo-Liang, GU Bai-Sen, DONG Qi-Yin   

  1. 1. Construction Headquarters of Wushaoling Tunnel Works2. The 1st Railway Survey &|Design Institute 3. The 2nd Railway Survey &|Design Institute
  • Received:2006-08-18 Online:2006-12-20 Published:2009-12-11

Abstract:

Due to the features of Wushaoling tunnel, the Owner places great emphasis on the emergency rescue and disaster prevention and construction safety. On basis of the advices made by the design institutes, construction companies, supervising agencies, research institutes and experts, the Owner determines the emergency rescue and disaster prevention plan to be adopted during the construction and operation of the tunnel and makes constant optimization of the technical countermeasures against tunnel collapse. The emergency rescue and disaster prevention plan and the countermeasures are executed carefully and satisfactory effects are achieved.

Key words: extralong tunnel emergency rescue and disaster prevention  , technical countermeasure  , Wushaoling tunnel

CLC Number: