ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2006, Vol. 26 ›› Issue (6): 37-40.DOI: B
• wenzhang • Previous Articles Next Articles
SONG Jian-Beng, LI Guo-Liang, GU Bai-Sen, DONG Qi-Yin
Received:
Online:
Published:
Abstract:
Due to the features of Wushaoling tunnel, the Owner places great emphasis on the emergency rescue and disaster prevention and construction safety. On basis of the advices made by the design institutes, construction companies, supervising agencies, research institutes and experts, the Owner determines the emergency rescue and disaster prevention plan to be adopted during the construction and operation of the tunnel and makes constant optimization of the technical countermeasures against tunnel collapse. The emergency rescue and disaster prevention plan and the countermeasures are executed carefully and satisfactory effects are achieved.
Key words: extralong tunnel emergency rescue and disaster prevention  , technical countermeasure  , Wushaoling tunnel
CLC Number:
U456.3+3
SONG Jian-Beng, LI Guo-Liang, GU Bai-Sen, DONG Qi-Yin. Emergency Rescue and Disaster Prevention Plan and Collapse Prevention Countermeasures for Wushaoling Extralong Tunnel[J]. Tunnel Construction, 2006, 26(6): 37-40.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2006/V26/I6/37