ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2006, Vol. 26 ›› Issue (增刊2): 23-26.DOI: A

• wenzhang • Previous Articles     Next Articles

Discussion on Survey Technology for Improving Holingthrough
Accuracy of Shieldbored Tunnels

SHU Hong-Meng   

  1. Guangzhou Municipal DunJian Underground Construction Engineering Co., Ltd., Guangzhou 510030, China
  • Received:2006-10-31 Revised:2006-11-27 Online:2006-12-18 Published:2010-01-08

Abstract:

On basis of the survey practice in TianHua shieldbored running tunnel on line 3 of Guangzhou Metro, the author presents the survey works in the construction of the shieldbored Metro tunnels, analyzes on the influence of the traverse survey accuracy on the holingthrough accuracy and recommends some countermeasures to improve the holingthrough accuracy.

Key words: shieldbored tunnel  , holingthrough accuracy  , survey deviation  , traverse survey adjustment

CLC Number: