The matching of the muck loading, transporting and hoisting equipment for No. 7 inclined shaft of Taihangshan tunnel on Shijiazhuang~Taiyuan passengerdedicated railway is presented in the paper. For No. 7 inclined shaft, the traditional railbound transportation system for the main tunnel is optimized into a comprehensive plan consisting of trackless transportation system for the main tunnel, muck transferring at the shaft bottom and railbound transportation system for the inclined shaft. The comprehensive plan combines the advantages of the railbound transportation system and the trackless transportation system, which work relatively independently and give play to their own advantages. In the end, continuous hoisting is guaranteed and the advance rate is improved.
Key words: railbound transportation system  , inclined shaft hoisting  , equipment matching  , shaft station  , arrangement
CLC Number:
TD55
DIAO Yu-Liang. Equipment Matching for Inclined Shaft with Railbound Transportation System and Arrangement of Shaft Station[J]. Tunnel Construction, 2007, 27(增刊1): 19-22.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I增刊1/19