ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2007, Vol. 27 ›› Issue (增刊1): 47-48,82.DOI: B

• wenzhang • Previous Articles     Next Articles

Causes and Prevention Measures for Cracks on Bulk Concrete Structures:
Case Study on Bridge Works on Hefei~Wuhan Railway

 ZHANG Li   

  1. Project Headquarters of No. 3 Bid Section of Hefei~Wuhan Railway, China Railway
    Tunnel Group, Jinzhai 237351, Anhui, China
  • Received:2007-03-19 Revised:2007-04-10 Online:2007-06-18 Published:2010-01-05

Abstract:

The cracks on bulk concrete structures have huge adverse effect on the longterm safety and durability of the structures. In most cases, the cracks occur in the early period. Therefore, it is of great importance to probe into the causes and prevention measures for the cracks. After presenting the causes for and types of the cracks on bulk concrete structures, the paper recommends comprehensive crackprevention measures in several aspects.

Key words: bridge works  , bulk concrete  , crack  , shrinkage  , stability  , crack control

CLC Number: