ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2007, Vol. 27 ›› Issue (1): 29-33,83.DOI: B
• wenzhang • Previous Articles Next Articles
XIE Chao-Jun
Received:
Revised:
Online:
Published:
Abstract:
On basis of the requirements for the tunnel ventilation systems of Metro stations with screen doors, the author presents the typical arrangement modes of the ventilation equipment rooms for the Metro running tunnels, summarizes the advantages and disadvantages of the typical arrangement modes and expatiates on the application requirements and selection of the typical arrangement modes, which can provide reference for the design of similar works in the future.
Key words: Metro, tunnel, ventilation, equipment room, arrangement
CLC Number:
U453.5
U452.2
XIE Chao-Jun. Typical Arrangement Modes of Ventilation Equipment Rooms for Metro Tunnels[J]. Tunnel Construction, 2007, 27(1): 29-33,83.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I1/29
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou Railway
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine