ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2007, Vol. 27 ›› Issue (2): 1-3,35.DOI: B
• wenzhang • Next Articles
LIU Ru-Chen
Received:
Revised:
Online:
Published:
Abstract:
Taking the construction of Yesanguan tunnel and Dazhiping tunnel on Yi-Wan railway as case histories, the paper expatiates on the comprehensive geology prediction program adopted for the karst tunnels with high risks. On basis of the case histories, the paper presents the geology prediction methods and the data processing methods actually adopted during the tunnel construction. By means of the geology prediction technology presented, the largescale faults are successfully predicted and importance guidance is provided for the tunnel construction.
CLC Number:
 
U452.1
LIU Ru-Chen. Advance Geology Prediction Technology Applied during Construction of Karst Tunnels on Yi-Wan Railway[J]. Tunnel Construction, 2007, 27(2): 1-3,35.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I2/1