For the construction of a large crosssection Metro station in busy urban area by means of side drift method, monitoring is made on surface subsidence, crown settlement, convergence, displacement and stress variations. On basis of the monitoring results, detailed analysis is made on deformation resulted by construction activities and a preliminary summary is made on the deformation pattern of construction of large crosssection tunnels by means of side drift method.
CLC Number:
U455
GAO Jun. Analysis on Deformation of Large Crosssection Tunnels Constructed by Side Drift Method[J]. Tunnel Construction, 2007, 27(2): 32-35.