ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2007, Vol. 27 ›› Issue (2): 36-39.DOI: B
• wenzhang • Previous Articles Next Articles
WANG Gang
Received:
Revised:
Online:
Published:
Abstract:
On basis of the statistics of construction of large crosssection tunnels crossing directly underneath existing Metro lines and the large number of monitoring data obtained in the job site, the author makes detailed analysis on the construction dynamics so as to provide reference for other similar works.
CLC Number:
 
U455
WANG Gang. Dynamic Analysis on Construction of Large Crosssection Tunnel Adjacent to Existing Metro Line[J]. Tunnel Construction, 2007, 27(2): 36-39.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I2/36