ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2007, Vol. 27 ›› Issue (2): 36-39.DOI: B

• wenzhang • Previous Articles     Next Articles

Dynamic Analysis on Construction of Large Crosssection
Tunnel Adjacent to Existing Metro Line

WANG Gang   

  1. China Railway Tunnel Group
  • Received:2006-12-14 Revised:2007-01-11 Online:2007-04-20 Published:2009-12-03

Abstract:

On basis of the statistics of construction of large crosssection tunnels crossing directly underneath existing Metro lines and the large number of monitoring data obtained in the job site, the author makes detailed analysis on the construction dynamics so as to provide reference for other similar works.

CLC Number: