Selection of Construction Program for Zhou’aodi
Underground Passage Project

LIAO Jun, XIE Yong,  Gao-Xiang   

  1. 1. Wenzhou Communications Planning &|Design Institute2. Wenzhou Urbanbypass Highway Construction Headquarters3. Zhejiang Provincial Communications Planning &|Design Institute.
  • Received:2007-01-23 Revised:2007-02-05 Online:2007-04-20 Published:2009-12-03

Abstract:

In the paper, the construction program of Zhou'aodi underground passage is presented, with the emphasis being placed on the analysis and comparison of the separate bridge option and the shallowburied undercut tunnel option. The technical difficulties, construction periods, impacts on the construction of Wenzhou urbanbypass highway, construction costs and impacts on the safe operation of Jinliwen highway of the two options are considered comprehensively and it is recommended that the shallowburied undercut tunnel option should be adopted.

CLC Number: