Abstract:
In the paper, the construction program of Zhou'aodi underground passage is presented, with the emphasis being placed on the analysis and comparison of the separate bridge option and the shallowburied undercut tunnel option. The technical difficulties, construction periods, impacts on the construction of Wenzhou urbanbypass highway, construction costs and impacts on the safe operation of Jinliwen highway of the two options are considered comprehensively and it is recommended that the shallowburied undercut tunnel option should be adopted.
CLC Number:
U452
LIAO Jun, XIE Yong, Gao-Xiang. Selection of Construction Program for Zhou’aodi Underground Passage Project[J]. Tunnel Construction, 2007, 27(2): 50-53.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I2/50