ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2007, Vol. 27 ›› Issue (2): 72-74.DOI: B

• wenzhang • Previous Articles     Next Articles

Construction Technology for Consolidation of Road Channel Side Slopes by
means of Prestressed Anchoring Cables and Concrete Frames

 FAN Xiong-Gui   

  1. The 3rd Engineering Co., Ltd. of China Railway 7th Bureau Group
  • Received:2006-11-14 Revised:2006-12-15 Online:2007-04-20 Published:2009-12-03

Abstract:

Taking Guangyan highway as project case, the paper presents in detail the construction methods for the consolidation of the road channel side slopes by means of prestressed anchoring cables and concrete frames. The paper also probes into the selection of the construction machinery and raw materials for the anchoring cables, the construction processes, items to which special attention should be paid during construction and quality control measures.

CLC Number: