ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2007, Vol. 27 ›› Issue (2): 78-82.DOI: B
• wenzhang • Previous Articles Next Articles
JI Wei, YI Jian-Wen, ZHENG Qing-Jun
Received:
Revised:
Online:
Published:
Abstract:
Taking the construction of the Naqu river section of the subgrade of QinghaiTibet railway as example, the paper presents in detail the structural design, construction material, construction technology, construction process and quality control principle of the geogrid reinforced earth retaining walls and makes a summary of the construction experience. The paper is helpful for the extensive application of the geogrid reinforced earth retaining walls in railway works.
CLC Number:
U417.1+15
JI Wei, YI Jian-Wen, ZHENG Qing-Jun. Construction Technology for Geogrid Reinforced Earth Retaining Walls for Subgrade in Plateau Wetland: Case Study on QinghaiTibet Railway[J]. Tunnel Construction, 2007, 27(2): 78-82.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I2/78