ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2007, Vol. 27 ›› Issue (3): 108-111.DOI: A
• wenzhang • Previous Articles Next Articles
LIN Guo-Jing
Received:
Revised:
Online:
Published:
Abstract:
Taking Shanggongshan tunnel on Zhangjiuhe River Water Diversion/Supply Project in Kunming, China as an example, the author analyzes such notorious adverse geological conditions as squeezing and/or swelling ground, fault and/or fracture zone, mud burst and water inflow that impede the boring of the doubleshielded TBMs and recommends options and countermeasures for these difficult geological conditions from the macro and micro viewpoints, which can provide reference for future tunnel construction by doubleshielded TBMs.
CLC Number:
 
U455.3+9
U455.43
LIN Guo-Jing. Problems and Countermeasures for Tunnel Construction by Doubleshielded TBMs in Adverse Geological Conditions[J]. Tunnel Construction, 2007, 27(3): 108-111.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/A
http://www.suidaojs.com/EN/Y2007/V27/I3/108