Tunnel Construction ›› 2007, Vol. 27 ›› Issue (3): 21-23.DOI: A

• wenzhang • Previous Articles     Next Articles

Discussion on Some Problems in Chamber Blasting Design

 HAO Fei   

  1. Road and Bridge Corp. of Xingtai,
  • Received:2006-09-12 Online:2007-06-20 Published:2009-12-04

Abstract:

The paper analyses some problems in the chamber blasting design and expounds the development approach of the automatic chamber blasting design system, computeraided selection of the specific charge based on theoretical computation method and the reasonable forecast of the safety factors. Furthermore, the paper also describes the charge shapes, the differential time and the guide hole stemming.