ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2007, Vol. 27 ›› Issue (3): 47-50.DOI: B

• wenzhang • Previous Articles     Next Articles

Design of Doublearch Opencut Extralarge Span Tunnel for Hechuan Station

 PAN Chao   

  1. China Railway Eryuan Engineering Group Co., Ltd.
  • Received:2007-05-10 Online:2007-06-20 Published:2009-12-04

Abstract:

Located in the fill of Hechuan Station Yard on SuiYu Railway Line, the doublearch opencut extralargespan tunnel for Hechuan Station is a largespan highfilled highwayrailway separate grade opencut tunnel. The tunnel has a total length of 71.5m, truncated portals, 17.32m inner net clearance width of single span, 45.2m maximum width of the doublearch structure and 9m filling depth on the top of the crown. This paper introduces the design of the main structure of this opencut tunnel.

Key words: Hechuan opencut tunnelseparate grade opencut tunnel, extralarge cross sectiondoublearcharge spandesign of opencut tunnel

CLC Number: