ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2007, Vol. 27 ›› Issue (3): 59-61.DOI: B
• wenzhang • Previous Articles Next Articles
ZHANG Shun-Zhong
Received:
Online:
Published:
Abstract:
A section of Yesanguan tunnel on Shanghai~Chengdu highway passes through a superhuge karst collapse accumulation body. The construction technologies for the mentioned section of Yesanguan tunnel, including advance reinforcement, tunnel excavation and floor consolidation, are presented in the paper. Such countermeasures as long forepoling reinforcement assisted with pregrouting, top heading/bench excavation method, Ishaped steel ribs and floor grouting consolidation are taken during tunnel construction and good results have been achieved.
CLC Number:
U455.4
ZHANG Shun-Zhong. Construction Technology for Tunnel Sections Passing through Superhuge Karst Collapse Accumulation Body: Case Study on Yesanguan Tunnel[J]. Tunnel Construction, 2007, 27(3): 59-61.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I3/59