[1] |
PENG Du, LIU Wei, ZHAO Fuyu, PAN Jianhua, PENG Jianxing.
Special Investigation Means and Methods of Karst of Kunming Rail Transit
[J]. Tunnel Construction, 2019, 39(S2): 269-282.
|
[2] |
XU Qipeng, NI Hanjie, WANG Yue.
Detection and Prevention Technology of Diaphragm Wall Joints Seepage
[J]. Tunnel Construction, 2019, 39(S2): 372-378.
|
[3] |
LI Hui, HAN Ziqiang, CHEN Peng.
Application of Transient Electromagnetic Method in Groundwater Prediction of Highway Tunnel
[J]. Tunnel Construction, 2019, 39(S1): 355-360.
|
[4] |
GAO Ziqian, LIU Xingbo, HA Jianbo, WU Xiangbin, LIU Wei, REN Yong.
Design and Application of Spray Maintenance Trolley Based on PLC Control System
[J]. Tunnel Construction, 2019, 39(S1): 456-464.
|
[5] |
LIU Tongjiang, TANG Gang, WANG Jun, SUN Yafei.
Treatment Technology of Giant Karst Cave of Gaoshan Tunnel on QianjiangZhangjiajieChangde Railway
[J]. Tunnel Construction, 2019, 39(6): 972-982.
|
[6] |
XING Xiuju.
3D Transient Electromagnetic Advanced Detection Technology for Karst Tunnel
[J]. Tunnel Construction, 2019, 39(2): 287-293.
|
[7] |
SUN Yafei, WANG Jun, YU Mingyang.
Stability Assessment of Railway Tunnel Crossing Giant Karst Cave and Design of Construction Protective Shed Frame
[J]. Tunnel Construction, 2019, 39(12): 2036-.
|
[8] |
DENG Zhe.
Precision Detection and Data Processing Method for Portal Steel Ring of Metro Shield Tunnel
[J]. Tunnel Construction, 2019, 39(11): 1832-.
|
[9] |
MA Weibin, CHAI Jinfei.
Development Status of Disease Detection, Monitoring, Evaluation and Treatment Technology of Railway Tunnels in Operation
[J]. Tunnel Construction, 2019, 39(10): 1553-1562.
|
[10] |
ZHANG Chongmin, ZHANG Fengkai, LI Yao.
Study of Full Waveform Inversion of Advance Tunnel Geological Prediction by Ground Penetrating Radar
[J]. Tunnel Construction, 2019, 39(1): 102-109.
|
[11] |
ZHOU Jie, CHEN Yubo, WANG Yao, FU Zhihong, ZHOU Mi, LIAO Xian.
Application and Adaptability Analysis of τp Transform in Seismic Advance Detection of Tunnel
[J]. Tunnel Construction, 2018, 38(6): 971-976.
|
[12] |
ZHOU Kun, WANG Hua.
Application of Crosshole CT Method to Pile Foundation Distance Detection of Metro Engineering
[J]. Tunnel Construction, 2018, 38(5): 747-752.
|
[13] |
WANG Jun, QIU Jingge, YANG Fan, WANG Qingpeng, TAN Tianle.
Study of Disturbance Effect of Tunneling Blasting on Dangerous Rock of a Giant Dry Karst Cave Wall
[J]. Tunnel Construction, 2018, 38(1): 41-49.
|
[14] |
CAO Jiong, CHENG Guokai, ZHU Fulong, WANG Congmin, XIA Wen, ZHANG Hao, WANG Fengren.
Study of Infrared Detection Technology for Water Seepage of Cable Tunnel
[J]. Tunnel Construction, 2017, 37(S2): 14-19.
|
[15] |
WU Fengshou, HUA Xiaoming.
Study of High Precision Forward Recognition of Cavities behind Tunnel Lining based on Ground Penetrating Radar
[J]. Tunnel Construction, 2017, 37(S1): 13-19.
|