Tunnel Construction ›› 2007, Vol. 27 ›› Issue (3): 65-66,114.DOI: B
• wenzhang • Previous Articles Next Articles
DU Dao-Long
Received:
Online:
Published:
Abstract:
Taking the horizontal control survey of Qinling Tunnel as an example and on the premise of the survey design, the paper presents in detail the technical points and arrangement methods of the horizontal control survey inside long cutthrough tunnels and the concrete requirements and items to which attention should be paid during the survey. The paper can afford certain conferences for the control survey of similar works in the future.
CLC Number:
 
U452.1+3
DU Dao-Long. Horizontal Control Survey inside Long Cutthrough Tunnel[J]. Tunnel Construction, 2007, 27(3): 65-66,114.