Taking the construction of Youth Street Station of Shenyang Metro as case history, the author presents the major construction steps and key points of PBA (PileBeamArch) construction method. Due to the complex structure of the Metro station, PBA (PileBeamArch) construction method is adopted, which improves the safety and stability of the works, minimizes the deformation occurring during construction and protects the adjacent structures and buildings effectively.
CLC Number:
U455
CHEN Chao, DONG Xiao-Long. Key Construction Technologies and Countermeasures for Largescale Mined Interchange Metro Stations[J]. Tunnel Construction, 2007, 27(3): 71-74,91.