Treatment Technology for Portal Section of Twintube Soft Ground
Tunnel with Largespan and Smallspacing

 HUANG Xin-She, CAO Zheng-Chi   

  1. 1. Hangzhou Branch of China Railway Tunnel Group Co., Ltd2. Scientific Research Institute of China Railway Tunnel Group Co., Ltd.
  • Received:2007-05-10 Online:2007-06-20 Published:2009-12-04

Abstract:

Shenyingxian tunnel, which is located in Shenjiamen urban area in Zhoushan city, is 1230m long. The north and south portal sections of Shenyingxian tunnel are located in fullyweathered to heavilyweathered cohesive soil ground containing gravels. The treatment of the portal sections of Shenyingxian tunnel, including small duct reinforcement, umbrella arch reinforcement and grouting reinforcement, is presented in the paper.