ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2007, Vol. 27 ›› Issue (3): 84-87.DOI: B
• wenzhang • Previous Articles Next Articles
LIANG Yun-Sheng
Received:
Revised:
Online:
Published:
Abstract:
During the construction of a running tunnel on Line 5 of Beijing Metro located in waterrich saturated ground, vertical jet grouting piles are installed on both sides of the tunnel from the ground surface to create waterstopping pile walls and horizontal jet grouting piles are installed from inside the tunnel to create waterstopping curtains so as to consolidate the ground and control the deformation, to create water barriers and eliminate the water risks and to take comprehensive countermeasures and guarantee the construction safety. The construction technology of the described jet grouting piles is presented in the paper.
CLC Number:
 
TU472.3+6
LIANG Yun-Sheng. Construction Technology of Jet Grouting Piles Applied in Urban Metro Works[J]. Tunnel Construction, 2007, 27(3): 84-87.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I3/84