ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2007, Vol. 27 ›› Issue (3): 88-91.DOI: B
• wenzhang • Previous Articles Next Articles
DONG Dao-Hai
Received:
Revised:
Online:
Published:
Abstract:
No. 1 Dayaoshan tunnel on Wuhan~Guangzhou passengerdedicated railway is 10081m long. For the sake of construction schedule and future operation, an access adit with 888m length is installed at the intermediate point on the left of the tunnel alignment. Through the access adit, two more working faces are provided for the construction of the main tunnel. The equipment matching and highspeed construction technology (including blasting, excavation, muck loading and haulage, primary reinforcement and secondary lining) for the two mentioned working faces are presented in the paper, which can provide reference for the highspeed construction of similar works in the future.
CLC Number:
 
U455.4
DONG Dao-Hai. Highspeed Fullface Construction Technology for Dayaoshan Passengerdedicated Railway Tunnel[J]. Tunnel Construction, 2007, 27(3): 88-91.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I3/88