Tunnel Construction ›› 2007, Vol. 27 ›› Issue (4): 1-5.DOI: B
• wenzhang • Next Articles
LIANG Wen-Hao, LIU Pei-Shuo, LI Guo-Liang, LIU Cheng, CHEN Chao-Hua
Received:
Online:
Published:
Abstract:
The selection of the routes and construction plans of Guanjiao tunnel on the second line of Xining~Ge’ermu section of Qinghai~Tibet railway is presented in detail in the paper. The focus of the paper is placed on the analysis of the drill+blast construction method and TBM construction method to be adopted for Guanjiao tunnel. The paper can provide reference for the design of similar long tunnels in the future.