Tunnel Construction ›› 2007, Vol. 27 ›› Issue (4): 52-54.DOI: B
• wenzhang • Previous Articles Next Articles
WANG Xun, YANG Bo, LIU Wen-Bin
Received:
Revised:
Online:
Published:
Abstract:
It is a common working procedure that the shield machine should cross the completed station to get to the next section. It is a topic worth of considering how to cross the station fast, economically and effectively so as to ensure the schedule of the works and the safety of the equipment. The construction technique of the shield machine HERRENKNECKT S285 crossing Beigongmen station of No.20 bid section of line 4 of Beijing Metro is presented in the paper.
Key words: shield machine , movement stationcrossing construction technique
CLC Number:
U455.43
WANG Xun, YANG Bo, LIU Wen-Bin. Construction Technique on Stationcrossing Movement for Shield Machine[J]. Tunnel Construction, 2007, 27(4): 52-54.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I4/52