Tunnel Construction ›› 2007, Vol. 27 ›› Issue (4): 60-64.DOI: B
• wenzhang • Previous Articles Next Articles
HE Shan-Ning
Received:
Revised:
Online:
Published:
Abstract:
Taking No.4 vertical shaft of Beijing Rail Transit Line as works case,this paper makes analysis on the complicated geology,environment,difficulties and possible problems in the design and construction of extradeep diaphragm walls in sandpebble ground,and describes the technical measures taken in such aspects as the division of the diaphragms, construction sequence, concrete casting and quality control of channel cutting so as to ensure the successful construction of the diaphragm walls.
CLC Number:
U455.45+2
HE Shan-Ning. Design and Construction of Extradeep Diaphragm Walls in Sandpebble Ground in Beijing[J]. Tunnel Construction, 2007, 27(4): 60-64.