ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2007, Vol. 27 ›› Issue (5): 1-4.DOI: B
• wenzhang • Next Articles
WANG Meng-Shu, He-Hua-Wu
Received:
Online:
Published:
Abstract:
Great achievements have been made in the construction of QinghaiTibet railway: a. Breakthrough development has been achieved in the construction of QinghaiTibet railway; b. The difficult problem of frozen soil has been solved by means of scientific and technological innovations; c. The basic national policy of protecting the ecological environment has been strictly followed; d. Medical and health measures have been taken in advance and the health of the workers has been guaranteed; e. The railway construction concept has been updated and world firstclass railway has been built.
CLC Number:
U2
WANG Meng-Shu, He-Hua-Wu. Construction Achievements of QinghaiTibet Railway[J]. Tunnel Construction, 2007, 27(5): 1-4.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I5/1