Tunnel Construction ›› 2007, Vol. 27 ›› Issue (5): 30-33.DOI: A
• wenzhang • Previous Articles Next Articles
LIN Chang-Zhen
Received:
Revised:
Online:
Published:
Abstract:
Existing consolidation model of ground with vertical drains under instantaneous loading is extended for timedependent loading. According to the consistency of average consolidation degree, the ground with partially penetrated drains is turned into an equivalentdoublelayered ground under single ramp loading, and the analytical solution of onedimensional consolidation is given. Compared with FEM result, the method of equivalentdoublelayered ground can be used to calculate the consolidation degree of ground with partially penetrated vertical drains. The results of the numerical example show that the consolidation degree of ground with partially penetrated vertical drains is reduced under the effect of loading time and the influence on the upper ground is more obvious. In preliminary calculation, multiramp loading can be replaced by a single ramp loading.
CLC Number:
TU472
LIN Chang-Zhen. Consolidation of Ground with Partially Penetrated Vertical Drains under TimeDependent Loading[J]. Tunnel Construction, 2007, 27(5): 30-33.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/A
http://www.suidaojs.com/EN/Y2007/V27/I5/30