Application of Monitoring and Measurement in Construction of
Shallow Largespanned Doublearch Tunnels

CHEN Yuan-Bing, ZHOU Meng-Fa   

  1. 1. China Railway No. 2 Engineering Group Co., Ltd2. Scientific Research Institute of China Railway Tunnel Group Co., Ltd.
  • Received:2007-04-12 Online:2007-10-20 Published:2009-12-05

Abstract:

On basis of the monitoring and measurement applied in the construction of Huaishuping tunnel, a shallow largespanned doublearch tunnel, the authors present the acquisition, treatment and analysis of the monitoring data and the feedback of the information into the tunnel construction so as to provide guidance to the tunnel construction and optimize the reinforcement parameters. The paper can provide reference for the construction of similar works in the future.

CLC Number: