Tunnel Construction ›› 2007, Vol. 27 ›› Issue (5): 75-78.DOI: B
• wenzhang • Previous Articles Next Articles
HU Bin, SUN Mou
Received:
Online:
Published:
Abstract:
On basis of the working experience in Qinling tunnel on Xi'an~Ankang railway and Mogouling tunnel on Xi’an~Nanjing railway, the authors make some comments on the capabilities that the civil engineering technical personnel engaged in TBM tunneling should have and briefly present the relevant knowledge of TB880E tunnel boring machine.
CLC Number:
U455.43
HU Bin, SUN Mou. Requirements of TBM Tunneling to Civil Engineering Technical Personnel[J]. Tunnel Construction, 2007, 27(5): 75-78.