ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2007, Vol. 27 ›› Issue (5): 85-87.DOI: B
• wenzhang • Previous Articles Next Articles
DI Fei-Fei
Received:
Online:
Published:
Abstract:
During the construction of the intake tower project of the diversion system of Dongba hydropower works in Guangxi, China, largeface cantilever formworks construction technology is adopted, which results in good engineering efficiency in respect of high construction speed, low construction investment and good appearance quality of the structure. The working principle, main structures and key construction operation points of largeface cantilever formworks are presented in the paper, which can provide reference for the construction of superhigh mass concrete structures and other similar works in the future.
CLC Number:
TV544+.91
TV672
TU974
DI Fei-Fei. Application of Largeface Cantilever Formworks in Intake Tower Project of Dongba Hydropower Works in Guangxi, China[J]. Tunnel Construction, 2007, 27(5): 85-87.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I5/85