ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2007, Vol. 27 ›› Issue (6): 105-107,111.DOI: C
• wenzhang • Previous Articles Next Articles
JIANG Hong-Jun
Received:
Revised:
Online:
Published:
Abstract:
The shield tunneling quotas used in the cost budgeting for the Metro works in different cities in China are presented and brief analysis is made on some quotas. The paper can provide reference for the cost budgeting of shield tunneling works and for the revising of the quotas of shieldbored Metro tunnel works in the future.
CLC Number:
U455.43
JIANG Hong-Jun. Cost Budgeting and Quota Analysis for Shield Tunneling Works in Different Cities in China[J]. Tunnel Construction, 2007, 27(6): 105-107,111.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/C
http://www.suidaojs.com/EN/Y2007/V27/I6/105