ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2007, Vol. 27 ›› Issue (6): 19-21.DOI: A
• wenzhang • Previous Articles Next Articles
YAN Qi-Xiang, Geng-Ping, HE Chuan
Received:
Revised:
Online:
Published:
Abstract:
The equipment configuration of shield machines is one of the important factors that dominate the results, progress and investment of the works. For the construction of the running tunnels of Chengdu Metro in sandy cobble ground, the shield machine is required to have the capability of performing longdistance boring in sandy cobble ground, crushing the large boulders and cobbles and prevention and control of mud bursting. In the paper, the parameters of the basic equipment of a muddingtype EPB shield machine is presented, the functions of the equipment are analyzed and the thrust force parameters are verified.
CLC Number:
U455.3+9
YAN Qi-Xiang, Geng-Ping, HE Chuan. Equipment Configuration and Thrust Force Calculation for Muddingtype EPB Shield Machines in Sandy Cobble Ground[J]. Tunnel Construction, 2007, 27(6): 19-21.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/A
http://www.suidaojs.com/EN/Y2007/V27/I6/19