Study on Design of TBM Assemble Cavern of Drain
Tunnel in JinpingⅡ Hydropower Project

 SU Li-Jun,  Liu-Li-Xin   

  1. 1.State Key Laboratory of Water Resources and Hydropower Engineering Science,Wuhan University2.Chang Jiang Institute of Survey Planning Design &|Research
  • Received:2007-10-26 Revised:2007-11-01 Online:2007-12-20 Published:2009-12-06

Abstract:

Due to the rigorous time limit of drain tunnel in JinpingII Hydropower Project, compact plane layout that can satisfy the requirements of quick TBM assemble is designed for the TBM assemble cavern, minimal crosssection that can satisfy the assemble is designed, reinforcement pattern consisting of rock bolts, shotcreting and wire meshing is designed. The design plan of the TBM assemble cavern is favorable for the ontime boring the TBM.