ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2007, Vol. 27 ›› Issue (6): 52-56,62.DOI: B
• wenzhang • Previous Articles Next Articles
WANG Meng-Qing, XU Jun-Zhe, Ni-Bing-Yu
Received:
Revised:
Online:
Published:
Abstract:
With the development of urban rail transit, shield tunneling method has achieved rapid development in Metro construction. With reference to the practice of engineering project, the author mainly elaborates the critical technology for EPB shield tunneling crossing Xinzaohai (510m) in Xiaoxin section of line 4 of Guangzhou Metro. The successful execution of this project could give reference for similar works crossing seas in the future.
Key words: earth pressure balancerivercrossing, construction technologyboring parameterentering chamber under pressure
CLC Number:
U455.43
WANG Meng-Qing, XU Jun-Zhe, Ni-Bing-Yu. Construction Technology for EPB Shield Crossing Xinzaohai under Complex Geological Conditions[J]. Tunnel Construction, 2007, 27(6): 52-56,62.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I6/52