ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2007, Vol. 27 ›› Issue (6): 57-62.DOI: B

• wenzhang • Previous Articles     Next Articles

On Shield Construction Technology for Yellow River Crossing Tunnel of
Middle Line of SouthNorth Water Transferring Project

CA Hui, LI Rong-Zhi   

  1. CRTG &|Gezhouba Joint Management Department for Yellow River Crossing Project of
    Phase I of Middle Line of SouthNorth Water Transferring Projec
  • Received:2007-11-14 Revised:2007-11-27 Online:2007-12-20 Published:2009-12-06

Abstract:

The authors give a brief introduction to the Yellow River crossing project and the main operation modes of the slurry shield. The authors further provide detailed information on the assembly, launching, boring, segment erection, simultaneous grouting and the second launching of the slurry pressure balanced shield machine used for Yellow River crossing project. Finally, the authors make discussions on the boring construction in special section of the tunnel.

CLC Number: